The Wood Magazine Downloadable Woodworking Project Plan to Build Country-Fresh Bed is a essential addition to any workshop looking for Library solutions.
Under $50 – Perfect for stocking stuffers, hand tools, small accessories
Product Description
Dreamland takes on a whole new look with this solid-oak queen-size bed design. Frame-and-panel construction makes for lifelong endurance. One of a 5-piece set The bed measures 88-1/8in. long and 67-1/2in. wide The headboard stands 43-1/4in. tall.Click here to view all Country Fresh bedroom suite pieces.This plan was built and proven in the WOOD magazine shop by its editors and master craftsmen.This is a downloadable plan. Instructions given to download after checkout.MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY
Product Dimensions:
Length: 1.00 IN X Width: 9.00 IN X Height: 12.00 IN Weight: 1.0000 LB
Note: We do not display prices to ensure you always see the most current Woodcraft pricing upon click.